Malibu Creek Ecosystem Restoration Project Advances to Pre-construction, Engineering, and Design Phase
MALIBU, Calif., -- California State Parks announced today the start of the pre-construction, engineering, and design (PED) phase of the Malibu Creek Ecosystem Restoration Project, located within Malibu Creek State Park in the Santa Monica Mountains, Los Angeles County. The department, along with a team of consultants and partners from McMillen, LLC, Stillwater Sciences, California Trout (CalTrout) and others will conduct baseline biological surveys, hydrology/hydraulic modeling and flood risk assessment, engineering plans, environmental permitting, public outreach, and other project studies to advance the project to a 90% level of design.